Chartham Park Golf Club

Chartham Park Golf Club

Client

Transcontinental Golf Construction Ltd

Description

Earthworks and landscaping in the construction of this 18 hole golf course, including excavation of the 6 lakes and construction of the stone retaining walls, as well as sympathetic landscaping in keeping with the surrounding features.

We also carried out the construction of the access road and reinforced concrete cart paths.

Duration

48 weeks

London Golf Club

London Golf Club

Client

Transcontinental Golf Construction

Description

Excavation of 10 lakes and construction of such golf course features as tees, greens and bunkers, as well as reinforced concrete buggy paths, main access road, and the installation of the main carrier drains across the golf course.

Duration

52 Weeks

Brighton Palace Pier

Brighton Palace Pier

Client

Brighton Marine Palace & Pier Company

Description

The contract involved working underneath the listed structure to replace the sea worn pre-cast concrete planking that makes up the pier deck.  As the Pier is a busy tourist attraction, works had to be finished before the traditionally busy period of Easter, whilst maintaining all services to the adjacent fish and chip kiosk.

The specialist formwork / reinforcement was completed by our in-house carpenters / steelfixers and the concrete was pumped in to replace the edge beam.  The existing steelwork paint was cleaned and repainted to slow down erosion from the sea.

Duration

52 Weeks

Coastal Protection & Structures Maintenance Term Contract

Job Title

Coastal Protection & Structures Maintenance Term Contract

Client

Brighton & Hove City Council

Description

Construction and maintenance of coastal structures such as groynes, sea walls, rock catch fences and shingle beds, as well as inland structures such as bridges, retaining walls and arches.

Techniques utilised include reinforced concrete, shotcrete, resin mortar, brickwork, re-pointing, core drilling, fencing, and joint sealing.

We have also done extensive repairs to sea-front railings, as well as paving and access reconstruction work as part of this contract.

Duration

2008 – 2015 (Ongoing)

Bough Beach Reservoir – Fish Screen

Job Title

Bough Beach Reservoir – Fish Screen

Client

Sutton & East Surrey Water

Description

The project involved the following:

  • Removal of existing corroded Fish Screen and frames
  • Installation of new ‘ weld mesh type’ GMS Fish Screen and support frames

Duration

1 week

Term Maintenance Contract for British Gypsum

Job Title

Term Maintenance Contract for British Gypsum

Client

Saint-Gobain

Description

Various works including roads, drainage, reinforced concrete structures, earthworks and environmental works, both inside and outside the biggest plasterboard factory in the UK.

Externally we have completed a number of hard and soft landscaping schemes which have necessarily been sympathetic to the existing environment and have maintained the aesthetic rural appeal of the site.

Most recently we completed the construction of a 4,000m² lorry park including petrol interceptors, outfall control and surface water drainage system.

Duration

2006 – Ongoing

 

Elmer WTW – Cryptosporidium Filtration Plant

Job Title

Elmer WTW – Cryptosporidium Filtration Plant

Client

Sutton & East Surrey Water

Description

Works entailed the construction of reinforced concrete tanks enclosed in a steel framed building with corrugated steel panels, as well as all pressure and gravity pipework, ducting and general earthworks to facilitate the construction.

Duration

52 Weeks

Hazards Green Pipeline – East Sussex

Job Title

Hazards Green Pipeline

Client

South East Water

Description

The works comprised of the installation of approximately 4km of 450 diameter ductile iron pipeline between Hazards Green Water Treatment Works and Windmill Hill to replace the 9” cast iron main between Boreham Street and Windmill Hill, and the 10” cast iron main between Hazards Green Water Treatment Works and Boreham Street.

Additional reinforcement works were undertaken on a 450m, 300mm diameter pipe laid parallel to the existing ductile iron.

Duration

12 Weeks

Groombridge Water Treatment Works

Job Title

Groombridge Water Treatment Works / Groombridge to Langton Pipeline

Client

South East Water

Description

Works entailed an upgrade of the existing Langton pumps including the installation of a flow meter, new pumps, modifications to the existing contact tanks and refurbishment of the lagoons, combined with the laying of 3.75km of 300mm diameter ductile iron pipe to link to Langton Reservoir.

Duration

24 Weeks

Horse Eye & Downs Bridges – East Sussex

Job Title

Horse Eye & Downs Bridges

Client

East Sussex Highways

Description

Downs Bridge

Replacement of existing footbridge under a weekend road closure.  Ancillary works included service diversion, footpath diversion, new drainage and fencing works.

 

Horse Eye Bridge

The 8 week project involved coffer damming off the bridges, clearing the silt from the river beds, taking down and rebuilding the parapets, strengthening the river banks and re-pointing the arch structure.

Matching bricks were specially sourced to ensure the integrity of the original design was maintained.

Duration

8 Weeks