Sector:Infrastructure
Client:East Sussex Highways (BBLP)
Year of Project:2025
Project Value:£150,000
Duration:7 weeks

The failure of a road bridge in a minor country lane led to an emergency scheme under a road closure and was an opportunity to show the extent of the skills of our directly employed workforce. The work included the following:

  • Installation of temporary dams with flows flumed through the existing culvert.
  • Demolition and reconstruction of the downstream sandstone headwall.
  • Careful removal of the existing road surface and construction of a concrete saddle over the brick culvert.
  • Reconstruction of the road and installation of bespoke steel rail parapet fencing to meet the local stakeholders wishes