The construction of 3.1Km of strategic water mains reinforcement, including the following:
- 950m of 315mm O.D. PE100 SDR17 pipe
- 1670m of 355mm O.D. PE100 SDR17 pipe
- 170m of 450mm O.D. PE100 SDR17 pipe
- 280m of 250mm O.D. PE100 SDR17 pipe
Installation of washouts and valves, as well as surveying and testing existing valves and washouts at connection points.
CJ Thorne was also responsible for all Traffic Management on the route.





