Civils works to upgrade an existing water supply works, including the following:
- Type 3 Road Construction
- 90m long x 1.5Gabion Retaining Wall
- Transition Slabs and R.C. Road Construction
- Booster Kiosk RC Slab
- 3m dia. Shaft in Hardstanding
- Ducting and Drawpits
- 150mm up to 400mm Ductile Iron Pipework
- MCC Kiosk Slab
- Footpaths and Hardstanding Areas
CJ Thorne delivered the civils package with a combination of direct labour and RC formwork subcontractor WestConn.