Since 1939 we have been proud to work on a huge range of projects across the south east, protecting landscapes, enhancing our natural environment and maintaining utilities for local residents.

These are just some examples of our work.

Redgate Mill Wastewater Treatment Works

Redgate Mill Wastewater Treatment Works

Wastewater

Upgrading existing infrastructure to support the removal of ammonia and improve the quality of treated water discharged into local watercourses.

Horsted Keynes Sewage Treatment Works

Horsted Keynes Sewage Treatment Works

Wastewater

Construction of new chemical dosing structures to support the removal of phosphorus from wastewater and prevent its discharge into local watercourses.

Herstmonceux Castle Sewage Treatment Plant

Herstmonceux Castle Sewage Treatment Plant

Wastewater

Construction of a new sewage treatment plant at this Grade II listed property, working closely with archaeologists to preserve any historic artefacts uncovered.

Water Bridge Roadworks

Water Bridge Roadworks

Infrastructure

Culvert replacement to improve the highway structure, including reconstructing the road to full highway specification.

Gatehouse Bridge

Gatehouse Bridge

Infrastructure

Emergency work to reinstate a failed road bridge, including installing temporary dams, replacement of damaged gabions and installation of steel rail parapet.

Bregsells Lane Embankment Stabilisation

Bregsells Lane Embankment Stabilisation

Infrastructure

Reconstruction of a 25m embankment either side of the busy A24, including drainage improvements and resurfacing.

Kings Road Arches Reconstruction – Phases 1 & 2

Kings Road Arches Reconstruction – Phases 1 & 2

Infrastructure

Demolition and reconstruction of 57 Victorian brick arches on Hove seafront.

Tilting Weirs Installation at Pevensey Levels

Tilting Weirs Installation at Pevensey Levels

Coastal, River and Environmental

Extensive project to replace an existing culvert and install solar powered tilting weirs to control the water height across the Pevensey Levels.

Brighton Marina Propping

Brighton Marina Propping

Coastal, River and Environmental

Repairs and reinforcement of the marina’s quayside, in highly challenging conditions, to strengthen the structure.

Bayham Lake Spillway

Bayham Lake Spillway

Coastal, River and Environmental

Construction of a new 10m spillway as part of the Bayham Lake flood defences, winning the Best Project award at the South East Construction Awards.

Wenceling, Lancing, Road Improvements

Wenceling, Lancing, Road Improvements

Infrastructure

Removal of existing concrete road bays and replacement, along with reinstatement of adjoining footways.

North Park Furnace Refurbishment

North Park Furnace Refurbishment

Coastal, River and Environmental

Repair and conservation work to maintain this scheduled monument and neighbouring public footpath and bridleway.

Ramsgate Wastewater Pipeline Replacement

Ramsgate Wastewater Pipeline Replacement

Wastewater

A high profile project to replace 400m of pumping main running through arable farmland in an area of historical interest.

Hooe Wastewater Treatment Works

Hooe Wastewater Treatment Works

Wastewater

Creation of a compound base using lime stabilisation; a lower cost and more environmentally friendly alternative to concrete.

East Sussex National

East Sussex National

Wastewater

Assess and upgrade the sewage treatment system used for the East Sussex National Golf Club and Hotel.

Woodmansterne Water Treatment Works

Woodmansterne Water Treatment Works

Potable Water

Extensive work over 130 weeks to refurbish and expand capacity at the Woodmansterne Water Treatment Works.

Ebbsfleet Water Main Phase 4

Ebbsfleet Water Main Phase 4

Potable Water

Reinforcement of 3.1k of mains water pipework, including traffic management across the route.

Barcombe Water Treatment Works

Barcombe Water Treatment Works

Potable Water

Over a year’s work to upgrade the existing water supply works at Barcombe, for South East Water.

Arlington WSW

Arlington WSW

Potable Water

Installation of a new sludge treatment system as part of South East Water’s ongoing infrastructure modernisation.

Sheffield Park Gardens Cascade and Ponds

Sheffield Park Gardens Cascade and Ponds

Coastal, River and Environmental

Restoration of the iconic cascade between the Upper and Lower Woman’s Way Ponds at this National Trust garden.

Run Common Roadworks

Run Common Roadworks

Infrastructure

Construction of cantilevered sheet piled walls to support the deteriorating carriageway, followed by embankment reconstruction and road resurfacing.

Reigate Hill Roadworks

Reigate Hill Roadworks

Infrastructure

Reinforcement of a retaining wall structure supporting the busy A217, involving vehicle restraints system installation and full resurfacing following the work.

Eatons Farm Footbridge

Eatons Farm Footbridge

Removal of the original, unsafe timber footbridge and replacement with a bespoke, 22m long reinforced plastic bridge.

Birling Gap Stairs

Birling Gap Stairs

Coastal, River and Environmental

Replacement of the famous staircase at Birling Gap, ensuring safe access to the beach from the eroding cliffs.

Cuckoo Trail Upgrades

Cuckoo Trail Upgrades

Infrastructure

Ongoing work with Wealden District Council to maintain the Cuckoo Trail, improving accessibility and visitor experience.

Horse Eye Sewer

Horse Eye Sewer

Coastal, River and Environmental

Replacement of a collapsed culverted section of the sewer to reinstate access to neighbouring farmland.

Brighton & Hove City Council Coastal Defences

Brighton & Hove City Council Coastal Defences

Coastal, River and Environmental

Management of the coastal protection structures, including groynes, sea walls, rock catch fences and shingle beds.

Coastguard Cottages, Cuckmere Haven

Coastguard Cottages, Cuckmere Haven

Coastal, River and Environmental

Urgent work to stabilise the existing sea defence structure and bring these iconic homes back from the brink.

Carden Primary School SuDS Project

Carden Primary School SuDS Project

Earthworks and Landscaping

Creation of wetland basin and pond to enhance the school environment and create outdoor learning opportunities.

Little Bex Hill Bank Stabilisation, Benenden

Little Bex Hill Bank Stabilisation, Benenden

Earthworks and Landscaping

Stabilisation of an embankment at the rear of a private property, which had suffered a significant landslip.

Great Pond, Sunninghill Park, Windsor

Great Pond, Sunninghill Park, Windsor

Earthworks and Landscaping

Remedial works to repair the dam crest of the Great Pond reservoir while minimising disruption to the residents of this Crown Estate.

Woodmansterne Soakaway Lagoon

Woodmansterne Soakaway Lagoon

Earthworks and Landscaping

Construction of a new 300m access road and a soakaway lagoon, part of the expansion of the adjacent Water Treatment Works.

Walshes Park, Crowborough

Walshes Park, Crowborough

Earthworks and Landscaping

A nine month project to create additional recreational space for residents, including all-weather walkways and drainage improvements.