Skip to content
Mon - Fri: 7:30am - 5:30pm
Sector:Infrastructure
Client:Barhale
Year of Project:2024
Project Value:£677,000
Duration:20 weeks

Breakout and reinstatement of concrete road bays and footways along West Way, Lancing.

Our work included:

  • Set up traffic management and maintain access to properties.
  • Breakout concrete slabs with 360 excavator and breaker.
  • Haul breakout to compound location via road legal dumpers.
  • Assess subbase of slabs and carry out CBR tests, replacing failed subbase where necessary.
  • Install mesh reinforcement, dowel bars and expansion joints.
  • Pour and finish concrete.
  • Allow concrete to cure over 7 days before any foot or vehicular traffic passes over.

The pavement and road repair completed so far at the end of Westway is superb. The standard and quality is excellent.

Geoff Patmore, local resident

Share this project